https://m.youtube.com/watch?feature=share&v=aOOuKMnNHIQ
Shawn and Jenn are installing a new pool, and they recently poured the cement for the deck. 7 cement trucks with 1/2 a load each had to back up the 1/4 mile plus driveway, with 2 switchbacks, to make the continuos pour of cement . There is 10 hours work converted to just over 1 minute of video, using a Go Pro Camera.
The pool itself looks small, but it is just about 20 X 40 in size! The round hole in the deck you see, is for a fire pit.
Till tomorrow...
I think I'd sooner pour concrete, truth be told.
ReplyDeleteThats the way to do it , get other people to do it for you.
ReplyDeleteNice video. And clearly, that was a great crew to pour, place, level, polish and finish the cement into concrete.
ReplyDelete